Strada shieldTraffic EngineeringExperience library

SR 60/Moreno Beach Drive Interchange Improvements (Phase 1)

Moreno Valley, CA

Client
City of Moreno Valley
Brian's role
Traffic Lead
Organization
Parsons Corporation
Period
12/2018 to 4/2025

Project record

Results were integrated with air quality and noise analyses to support environmental documentation.

- Brian led traffic modeling, forecasting, and operations analyses to support the Moreno Beach Interchange Improvement Project, located adjacent to the Moreno Valley Logistics Center. - His work included evaluating truck volumes and freight access conditions to guide interchange design in a high-demand goods movement corridor. - He provided detailed operational input on truck circulation patterns, turning movements, and staging constraints to ensure compatibility with freight operations in a logistics-heavy environment.